Citroen Xantia

since 1993 of release

Repair and car operation



Citroen Xantia
+ Introduction
+ Operation manual
+ Routine maintenance
+ engine Repair
+ Systems of cooling, heating
- Power supply system and release
   - Power supply system - petrol models
      Removal and installation of assembly of an air purifier
      Removal, installation and adjustment of a cable of gas
      Removal and installation of a pedal of gas
      Unleaded fuel - the general information and use rules
      Systems of injection of fuel - the general information
      Sbrasyvaniye of pressure in a power supply system
      Removal and installation of the fuel pump
      Removal and installation of the sensor of fuel consumption
      Removal and installation of a fuel tank
      Check of a condition and adjustment of system of injection of fuel
      Removal and installation of the case of a throttle
      Removal and installation of components of Bosch Motronic 5.1 system
      Removal and installation of components of Magneti-Marelli 8Р system
      Removal and installation of the inlet pipeline
      Removal and installation of a final collector
   + the Power supply system - diesel models
   + Systems of decrease in toxicity and production of the fulfilled gases
+ engine Electric equipment
+ Coupling
+ Transmission
+ Power shafts
+ Uniform hydraulic system
+ Brake system
+ Running gear and steering
+ Body and salon furnish
+ Onboard electric equipment
+ electric equipment Schemes


ad6e8668

Removal and installation of a final collector

Removal

L models 1.6 and 1.8

 PERFORMANCE ORDER

1. Disconnect a hose of supply of hot air from the screen of a collector and remove it from the car.
2. Turn out three fixing screws and remove the screen from the top part of a final collector.
3. Prop up protivootkatny boots back wheels, then поддомкратьте a front of the car and establish it on props.
4. In case of need disconnect electroconducting from the oxygen sensor (l-probe). Alternatively, prop up a reception pipe of system of production of the fulfilled gases in order to avoid stretching of electroconducting of the sensor.
5. Give nuts of fastening of a reception pipe to a final collector. Turn out a bolt of fastening of a pipe to a basic arm. Separate a pipe from a collector flange, remove laying.
6. Give eight nuts of fastening of a final collector to a head. Take a collector from an impellent compartment, remove sealing laying.

Models of 2.0 l

 PERFORMANCE ORDER

1. Prop up protivootkatny boots back wheels, then поддомкратьте a front of the car and establish it on props.
2. Give two nuts of fastening of a reception pipe to a final collector. Remove springs with the cups, take bolts and separate a pipe from a collector flange. Remove laying.
3. Give eight nuts of fastening of a final collector to a head. Take a collector from an impellent compartment, remove sealing laying. Pay attention to the remote pro-rates established between laying and the pipeline.

Installation

Installation is made upside-down. Pay attention to the next moments:
   a) Check a condition of hairpins of fastening of a collector, clean and restore a carving;
   b) Make sure of absoluteness of dryness and purity of interfaced surfaces of a collector and a head of cylinders, check their planeness. Do not forget to replace laying (and). All fixture should be tightened with demanded effort;
   c) Connection of a reception pipe of system of production of the fulfilled gases to a final flange of a collector make according to the instructions provided in the section of System of decrease in toxicity and production of fulfilled gases.