Citroen Xantia

since 1993 of release

Repair and car operation



Citroen Xantia
+ Introduction
+ Operation manual
+ Routine maintenance
+ engine Repair
+ Systems of cooling, heating
- Power supply system and release
   + the Power supply system - petrol models
   - Power supply system - diesel models
      Power supply system filling with fuel and removal from it air jams
      Check and adjustment of the maximum turns of the engine
      Removal, installation and adjustment of the thermosensitive sensor of turns of fast idling
      The electromagnetic locking valve - general information, removal and installation
      Removal and TNVD installation
      Methods of check of installation of the moments of injection of fuel
      Check and adjustment of the moments of injection (TNVD Lucas)
      Check and adjustment of the moments of injection (TNVD Bosch)
      Check of serviceability of functioning, removal and installation of nozzles of injection of fuel
      Removal, installation and adjustment of a cable of gas
      Removal and installation of a pedal of gas
      Removal and installation of assembly of a toplivozabornik with the fuel consumption sensor
      Removal and installation of a fuel tank
      Removal and installation of the inlet pipeline and final collector
      Turbokompressor - general information and precautionary measures
      Removal and turbokompressor installation
      Check of a condition and regenerative repair of a turbokompressor
      Removal and installation of the built-in cooler of a turbokompressor
      Removal and installation of an air purifier and accompanying components
   + Systems of decrease in toxicity and production of the fulfilled gases
+ engine Electric equipment
+ Coupling
+ Transmission
+ Power shafts
+ Uniform hydraulic system
+ Brake system
+ Running gear and steering
+ Body and salon furnish
+ Onboard electric equipment
+ electric equipment Schemes


ad6e8668

Removal and installation of the inlet pipeline and final collector

On the models equipped with a turbokompressor, assemblies of the inlet pipeline and a final collector are established on one sealing laying in view of what their dismantle is more reasonable for making together with the purpose of simultaneous replacement of laying.

Inlet pipeline

At assembly do not forget to make replacement of sealing laying (ok).

Removal

 PERFORMANCE ORDER

1. Disconnect a negative wire from the battery.
2. On models with the D9B engine without a turbo-supercharging remove an air distributor casing. In case of need remove also inlet air line and disconnect a ventilating tube from a jellied mouth of impellent oil (see appropriate sections of the present Chapter).
3. Disconnect a gas cable from TNVD (see. Removal, installation and adjustment of a cable of gas). Liberate a cable from intermediate clamps and shift it aside where it will not disturb pipeline/collector removal.
4. On the models equipped with system of a retsirkulyatsiya of fulfilled gases (EGR), disconnect ventilating hoses from stream and retsirkulyatsiya valves. Release nuts and bolts of fastening of each of valves to the pipeline and a collector remove klapanny assembly from the engine. Remove sealing laying.